22/11/2013 (Friday)
Title:
Presentation Day
-
2.15pm (setup table, setup laptop)
-
All students of FYP 1 must register at 2.30pm
-
Start 3.00pm – 5.00pm
-
2.30pm (Access Begin)
-
Accessed by Sir Mohd Zubir B Suboh
and Siti Afifah Bt Mohshim
Presentation
Requirements:
- 19 Slide (Minimum 8 Slide)
- Present 10-15 minutes
- Check with the supervisor first before presentation day
Contents:
- Introduction
- Problem Statements
- Aim & Objectives
- Scope & Limitation
- Literature Review
- Methodology
- Expected Outcome
- Progress work (30% Not necessary)
·
Comments
& Recommendations by Assessors:
-
The presentation was running smoothly but there were some comments and recommendations
given by the assessors.
-
Sir Zubir had given his recommendation of how to expend and wider the
implementation of my project such as at Gas Tank storage facilities, in the kitchen,
and so on.
-
Madam Afifah also gave her recommendation of using LPG Sensor rather than
Methane MQ-4 Gas Sensor so that it is easier to demonstrate during Engineers
Day as acquiring Methane Gas is rather difficult.